Product specification sheet
Download this product's specifications, options, applications and packing information for internal review.
If details do not appear, refresh this page (⌘R / Ctrl+R). No inquiry or order has been submitted.
Configuration RFQ reference XW-GB-CFG-BENCH-0074
A real project-configured outdoor bench assembly: the seat system acts through a controlled subframe, brackets and connections into a complete gabion base, with foundation and anchorage interfaces held in the same configuration record. A general gabion advertised for seating, a separate seat board or a concept render cannot substitute for the complete ID74 assembly.
Specifications, materials, inspection, packing and logistics must be frozen through complete RFQ and order review.
Download this product's specifications, options, applications and packing information for internal review.
Methods, sampling, tolerances and documents are confirmed by product construction, standard edition and order.
Packing, marking, pallets, container loading and destination conditions are reviewed with quantity and trade terms.
Compare similar constructions first, then review potential companion categories. The final combination depends on project use.
Complete specification, quantity, finish, packing, inspection and destination are reviewed by sales and production. This page makes no fixed commitment.
Provide the product, specification or drawing, quantity and unit, use, destination country/port, packing, trade term and required date.
State document requirements in the RFQ. Documents are supplied only for the matching batch, product scope and confirmed order; a standard reference is not certification.
Submit a drawing or specification for manufacturability, tolerance, process and packing review before a quotable order specification is created.
Submit use context, assembly geometry, seat-material route, subframe/brackets, connections and fasteners, gabion base, fill, anchorage/foundation, human-contact and site information. No SKU variant or outcome claim is generated before the drawing, BOM and continuous load path are approved.